Design for Prognostics

Pro-Active diagnostics and/or System Health. Using indicators to monitor system or process to perform tasks to the end of cycle.

  • Leading Indicators

    • Primary indicators. Example; tire pressure.
  • Secondary Indicators

    • When leading indicators are not available, or used to support a leading indicator. Example; when vehicle moves smoothly with inflated tire.
  • Grouped Indicators

    • Grouping indicators to increase probability.
  • Conditional Indicators

    • Indicators collective during a conditional phase of operation. Example; high or low load.
  • Prognostics strategy

    • Identify what sub systems or sub processes that need monitoring and what design are needed.

© Copyright 2022 - NitroWI - Website by: One Click